Projects under the Earthquake and Tsunami
Preparedness Component
Contingency Planning with regard
to Earthquake hazard for Dhaka, Chittagong and
Sylhet City
Contingency planning with
regard to earthquake hazard will be
to develop a comprehensive geo-hazard risk
reduction “Contingency Planning” strategy
that is linked to an easy implementation
framework to be able to address the current
needs and issues, which would be implacable
at all the national, city and agency level
and cover all the levels of disaster risk
management from preparedness to response.
The SOW under the proposed
project on Contingency planning with regard
to earthquake hazard is comprised of two
main activities:
-
Activity I: Determine
status of contingency planning and
design of interim contingency plan
-
Activity II: Turn interim
contingency plans into final versions
(using maps for selected urban areas
that highlight earthquake-vulnerable
school/hospital/emergency response and
control buildings etc.)
Seismic Hazard & Vulnerability
Mapping
The objective of Seismic
Hazard & Vulnerability Mapping is mainly to
develop seismic hazard maps, and
vulnerability maps for the critical
infrastructure as well as the building
stocks of Dhaka, Chittagong and Sylhet city
corporation areas. The study will also
undertake damage estimation for scenario
events so as to assess damage probabilities
and provide informed insight about the risks
involved.
The Scope of Work consists of
four main, complementary activities. They
are listed as follows:
-
Prepare regional and
local geological fault maps
-
Prepare engineering
geological maps for three cities (Dhaka,
Chittagong and Sylhet city corporations)
including the areas under future
expansion.
-
Prepare seismic hazard
maps for three cities by providing
seismic, geological and ground
conditions.
-
Prepare seismic
vulnerability and risk maps for three
cities by providing information on
vulnerability and risk conditions of
critical infrastructure.
Training, Advocacy and Awareness
Training, advocacy and
Awareness against earthquake and Tsunami
would be to develop trainings, drills,
advocacy and awareness in different
cross-section of the people from government
officials to community level in Dhaka,
Chittagong and Sylhet City Corporation
including their area under future
expansions.
The Scope of Work of the
Project; under the proposed project on
Training, advocacy and Awareness against
earthquake and tsunami hazard is comprised
of eight main activities:
-
Activity I: Decision
makers and planners are educated on
contingency plan and seismic hazard maps
-
Activity II: Safety and
evacuation training for the school
children and teachers
-
Activity III: Training to
the managers of critical infrastructures
on fire safety and evacuation
-
Activity IV: Aware and
educate the religious leaders against
earthquake dangers
-
Activity V: Training for
masons and bar-binders
-
Activity VI: Training on
tsunami vulnerability to the decision
makers/planners
-
Activity VII: Preparation
of documentary to develop awareness of
earthquake hazard and vulnerability
-
Activity VIII: Production
and dissemination of posters and leaflet
on earthquake vulnerability reduction